Sanbaoshi Hydropower Station is located in the middle reaches of Longxi River, about 29km away from Muchuan County and 139km away from Leshan City, making it convenient for external transportation. The designed annual utilization hours of the power station are 5478h, and the average annual generating capacity is 21.91 million kw/h. Due to the large economic benefits, it was decided to carry out health monitoring to ensure the safe use of the hydropower station, and construction will begin in January 2021.
Project name: Leshan Sanbaoshi Power Station safety monitoring construction project;
Project location: Leshan, Sichuan Province;
Time: January 2021 - February 2021;
Monitoring factors: tilt monitoring, dam stress monitoring; Conventional displacement monitoring, dam body vertical displacement monitoring; Environmental rainfall monitoring, wind speed and direction monitoring;